ORC AGM 2026 – MEASUREMENT COMMITTEE

Present

  • Zoran Grubiša, Chairman
  • Nicola Sironi, vice-chairman
  • Gennaro Aveta
  • Per Boeymo
  • Dimitris Dimou
  • Pablo Ferrer
  • Robert Jacobsen
  • Yannis Kalatzis
  • Romain Lanos
  • Tacha Montaner
  • Alberto Pindozzi
  • Michael Quist – absent
  • Chris Tutmark
  • Johan Tuvstedt
  • Chris Zonca
  • Matteo Zuppini
  • Joaquin Barenys – extra

1. Approval of Minutes of 2025 meeting

– Minutes were OK but there were issues about the implementation of 2025 GER 3 that should have gone in the rules.

2. Submissions

a) ESP 1 – FREEBOARD POINTS PHOTOS

Discussion about the scanned point clouds and the relevance of photos. Agreement that photos are definitely a big help. Chris Z raised that the scanning of hulls should be better explained in the scanning guide to not rely on a measurers experience.

Passes!

b) ESP 2 – Measurement protest

Deferred with the outcome that a thorough test for different parts of equipment might have to de set with differen thresholds.

c) ESP 4 – TL Measurement

Passes with minor rephrasing in the IMS to be added.

d) ESP 5 – Number of sections in offset file
ITA 4 – Station spacing

Submission was rejected in wait for proper research / study before changing the rule.

e) ESP 6 – Freeboard point on centerline
ITA 2 – Aft freeboard point

Issue with interceptors added afterwards and thus invalidating the FAM.
When there are point on centerline they need to be complemented by ordinary points on sheer.

f) FIN 1 – Sail age, material and weight in ORC Club

Rejected by ITC, giving small budget teams an inherently more attractive rating was still regarded as important.
The MC looks to other ways to acheive this and thus rejects FIN 1

g) FIN 4 – Liferaft in measurement condition


h) GER 1 – Owner’s responsibility

Passes with friendly and / or.

i) GRE 1 – LCFD for poles inclining

Passes / supported.

j) GRE 2 – Storm sails in IMS Editor

Passes / supported.

k) ITA 1 – Hull scanning

Passes!

l) ITA 6 – In-House certification

The WS policy will change in ERS thus the ORC / WS IHC policy requirement will become obsolete and the same thing will happen to WS-IHC program.

m) MANCOM 3 – ORC offset file services

Passes with a friendly amendment of keeping the one-offs free as long as there is no requirement of expedited processing, note that the current process that is working in Sweden will not be changed

n) MANCOM 4 – ORC standard penalties
Deferred to RMC

o) NED 2 – Adjustable forestay
Deferred to ROC

p) USA 3 – Waste water tanks
Deferred to RMC

q) USA 4 – Water ballast input
Deferred to RMC/ROC

r) USA 5 – Crew Extension (CEXT)

Passes with the consequence that boats with normal osr lifelines have a cext of -0,5m, the No Lifelines alternative should not give any penalty but the part with dyneema is rejected.

3. Any other business

New inclinometer & software, with bluetooth;
Joaquin Barenys showed an alternative to the JM sensors, still needs verification:

Could possibly be connected to a smartphone rather than a full PC!